Your new system can pay for itself. Interested? Click here.

Lic. Ins CAC1816500

(386) 252-1247

Daytona Beach Affordable AC Services, HVAC Financing

Thursday, April 6th, 2017

Alamo Business Center Installation

About the project:

We were delighted to be able to help Alamo Business Center upgrade some of their aging systems at their facilities.

We replaced their two of their systems and upgraded to two 3 Ton 14 SEER Goodman Heat Pump Split Systems, with both Air Handlers installed horizontally in their respective attic spaces.

Both came with brand new Hurricane Pads (Rated for 150 MPH Winds) as well as new drain pans underneath the Air Handlers, installed with Float Safety Switches, which protect the area underneath the indoor unit from water damage in the case the water drain were to back up at any point in the future. Both systems also were installed with new Honeywell PRO 5000 Digital Thermostats respectively.

 

Location: Bunnell, FL

Project Photos

This slideshow requires JavaScript.